Project guide

Construction or work near SL infrastructure

A project can create an SL interface because of its location, method or surrounding effects—even when it does not physically enter SL property.

· Videira Group

Identify the infrastructure and interface early

  • Tracks, tunnels, stations and entrances
  • Utilities, technical buildings and depots
  • Excavation, drilling, piling, blasting and foundations
  • Geotechnical, structural and logistics interfaces

Build a clear project picture

Bring together the location, drawings, planned methods, programme and relevant specialist assessments before coordination becomes time-critical.

Official source: Official Region Stockholm guidance (Swedish)

This is practical, independent guidance for construction projects. Current formal requirements and decisions are set by the relevant infrastructure owner and should be verified against official information.

Practical questions

Questions from project teams

How close can a project build to SL infrastructure?

Distance alone does not determine the answer. The facility, proposed method and potential impact require project-specific assessment.

When should Trafikförvaltningen be contacted?

Region Stockholm says contact should be made in good time when an activity may affect public transport infrastructure.

What information should be prepared?

A project description, location, drawings, methods, programme and relevant specialist assessments are useful starting points.

Does your project interface with SL?

Videira Group can coordinate the client-side workstream, documentation and communication with Trafikförvaltningen.

Discuss your project