What documents may be needed for an SL-related project?
There is no universal document list. The required information depends on the location, proposed works and infrastructure potentially affected.
· Videira Group
Practical information categories
- Project description and location
- Drawings and design information
- Methods and programme
- Risk-related material where relevant
- Organisation and specialist input
- Revisions and design changes
Coordinate before submission
Confirm that disciplines describe the same solution, revision and programme. Coordinated information reduces avoidable questions and keeps changes traceable.
This is practical, independent guidance for construction projects. Current formal requirements and decisions are set by the relevant infrastructure owner and should be verified against official information.
Does your project interface with SL?
Videira Group can coordinate the client-side workstream, documentation and communication with Trafikförvaltningen.
Discuss your project