Proximity guidance

Work within 50 metres of SL infrastructure

Current Region Stockholm guidance says contact should be made when an activity is planned within 50 metres of a public transport facility. This is an early-coordination trigger, not a universal engineering safety boundary.

· Videira Group

Distance is not the only consideration

Method, ground conditions, vibration, existing structures and the facility affected can matter. Region Stockholm also states that blasting beyond 50 metres should be reviewed.

Prepare the project facts

  • Location and measured relationship
  • Planned works and methods
  • Drawings and technical conditions
  • Programme and intended start
  • Relevant specialist assessments

Official source: Primary source: Region Stockholm, updated 10 May 2026

This is practical, independent guidance for construction projects. Current formal requirements and decisions are set by the relevant infrastructure owner and should be verified against official information.

Does your project interface with SL?

Videira Group can coordinate the client-side workstream, documentation and communication with Trafikförvaltningen.